PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing ductwork at the 4th floor Facing South.jpg Installing metal framing along the lower roof Facing North.jpg Installing sprinkler branches at the 2nd floor  Facing North (2).jpg Installing sprinkler branches at the 2nd floor  Facing North.jpg Spepnkler piping and heads at the 2nd floor Facing North.jpg Started laying out blokc at the 3rd floor detention cells Facing South-West.jpg Stone panel erection around the skylight Facing South.jpg
Previous pageNext page Spepnkler piping and heads at the 2nd floor Facing North
Spepnkler piping and heads at the 2nd floor Facing North